Man Camps Workforce Housing is always settled in a remote area, that’s because the remote site needs more development, and in this area, the transportation and the characteristics of modernization are not obvious enough, and it may difficult to find a shelter when it rains or buy a bottle of water when you feel thirsty.
Therefore, if the construction site needs comprehensive supporting facilities here, in addition to the dormitory, it also needs offices, a restaurant, a kitchen, a gym, a laundry room, shower rooms, and toilet rooms. Finding a complex Mobile Workforce Housing is very necessary.
To provide solutions for these places, after years of research and improvement at TD Container house, the container house now has fast assemble, movable, durable, low-cost, and multi-functional features.
Challenges
1. 30 days total from production to ready to use.
2. Basic furniture is also needed, including in.
3. This is a turn-key project.
4. Foundation also needs to solve by us.
5. They need different function rooms, including management office, staff office, management dormitory, staff dormitory, worker dormitories, toilet rooms, shower rooms, laundry rooms, small shops, storage room, etc.
Man Camp Workforce Housing Solutions
1. To solve the very tight production and assemble period, all items chosen in the modular size and standard configuration could meet this requirement.
2. The foundation needs a long time to make the ground level, so when we make production, send a team to their site and start working for the foundation of the
Temporary Workforce Housing.
3. Firstly, confirm with them about the land size, then we know how many units container house need total, then based on their daily working schedule, and there prefer, we make a detailed internal layout.
4. Due to all the items of the Moveable
Workforce Housing being the same, we could confirm the detailed internal layout with them when we assemble the whole structure.
5. We have long-term cooperation clients who can provide furniture to us, so once we confirm the design, choose the suitable furniture and then send it to our clients. All the production could start at the same time.
Outcome
They were surprised that we could complete the construction of this Mobile Workforce Housing in such a short period, and the quality was good. They refreshed their understanding of temporary buildings and will continue to cooperate if necessary in the future.
Author: TD Container
Publication Date: 8/18/2022